Parts Store Facility – Davis-Monthan AFB, AZ

Owner: US Army Corp of Engineers | Duration: 540 days | Project Cost: $5,384,813.00 | Type of Job: Design/Build | Size: 24,997 sq feet

Scope: Benchmark Contracting, Inc. dba Cobblestone Construction designed and constructed a new Parts Store Facility with structural metal and split face block exterior, reinforced concrete foundation and floor slab, structural steel frame and standing seam metal roof. Also included in the construction are screen walls, concrete facility aprons, walkways, communication support, pavement demolishment and all other necessary supporting facilities for a complete and usable facility. Supporting facilities include all utilities services, site lighting, fire protection and alarm systems, lightning protection, storm drainage, parking, information systems, 60 ton air conditioning system, and site improvements. Sustainable Design and Development (SDD) and Energy Policy Act of 2005 (EPAct05) features were incorporated. This project complied with DOD Anti-Terrorism/Force Protection requirements per UFC4-010-01 and was LEED Gold Certified under the USGBC LEED-NC v2.2 Rating System. Sustainable principals, to include Life Cycle cost-effective practices, were integrated into the design, development, and cost of the project.

Scroll to top